Earthwork, Utility & Roadway Numbers That Hold Up on Bid Day
Cut/fill volumes, underground utility takeoffs, and paving quantities pulled from your actual civil drawings — formatted for both public-agency review and private-sector submission.
Inside Every Civil Takeoff
No lump-sum guesswork. Each civil estimate is broken into the sections below so you can see exactly where every dollar and quantity comes from.
Grading & Earthwork Volumes
Cut, fill, and grading quantities pulled straight from your civil drawings — not rounded estimates.
Underground Utility Takeoffs
Water, sanitary sewer, and storm drainage materials and installation, quantified section by section.
Roadway & Paving Materials
Asphalt, concrete, curb, gutter, and related site materials for roadway and site-development scopes.
Heavy Equipment & Labor
Costs reflecting the mobilization and machine hours civil work actually requires — not generic averages.
Agency-Ready Documentation
Summary sheets structured to survive scrutiny on public-sector submissions, not just private bids.
Civil Scopes We Take On
Bridges & Structural Civil Work
Roadway & Site Grading
Water, Sewer & Storm Utilities
Public Infrastructure Projects
Private Site Development
Earthwork-Heavy Scopes
Amaze Estimation vs. Keeping It In-House
Your Bid-Ready Output Package
From Site Plans to Submitted Bid
Upload Your Civil Set
Grading plans, utility drawings, and any bid documents go through our secure intake — partial sets are fine to start.
Confirm Scope & Timeline
We review what's provided and send back a fixed price and delivery window before any work begins.
Estimators Run the Takeoff
Earthwork, utilities, and paving are quantified using current regional pricing and industry-standard software.
Bid-Ready Package Delivered
You get a complete, submission-ready summary — quantities, labor, equipment, and pricing, organized by section.
Civil Estimating, Answered
Both, by default. Every civil takeoff we run covers cut/fill and grading volumes alongside underground utility and paving quantities, unless you tell us to scope it narrower.
Yes. Our summary sheets are built to hold up under public-agency review, with quantities broken out clearly enough to defend line by line if questioned.
Send what you have. We'll flag which quantities we can finalize immediately and which need the remaining sheets before we lock the number.
We can deliver them as one combined package or as separate line-itemed sections — whichever makes it easier for you to build your bid.
24-48 hours is standard for most civil scopes. Larger infrastructure sets with heavy utility and grading detail may need a bit more lead time — we'll confirm on intake.
Lock In Your Numbers Before You Bid
Send your civil plan set and get a fixed price and delivery window back before we start any work — no surprises once the takeoff is underway